Completed-Solar-array-in-Tipp-for-Amber

Amber 50kW Smart SolarEdge Solar PV Installation at Tipperary Town

Veep Energy installed a 50kWP Smart Rooftop Solar PV System for Amber Petrol Station, located at Tipperary Town.

 

The Project commenced in 2022 & was finished in less than 3 days.

This Commercial Rooftop Installation consisted of 128 x 390Wp Glass to Glass PV Panels, a 50kWp SolarEdge Inverter and 64 SolarEdge Smart PV Optimiser for additional Fire Safety and for Module Level Monitoring.

 

The SolarEdge power optimisers allow monitoring of the solar panels on the module level and boost the solar panel generation by a whopping 30% annually.

 

The SolarEdge Solar system, a testament to our unwavering commitment to safety, offers unparalleled fire safety features. Its ARC detection and fire prevention capabilities ensure the Solar PV array is swiftly shut down in the event of a fault or arc development, providing you with a sense of security and peace of mind.

 

Commercial SEAI Grants available for your Solar PV project, contact us for more information

Project Information
  • Project Info

    50kW SolarEdge Smart Solar PV for Inver Petrol Station

  • Category

    Commercial Solar PV Installation

  • Date

    2022

Our Main Goal was to significantly reduce Inver’s Energy dependents on ESB also reduce the CO2 Emissions and help the business to meet with its ESG requirements.

While providing a professional product and service, which provides the Best Possible Efficiency and Investment Return

 

 

Project Details

  • 128 x 390WP Glass to Glass Tier 1 Mono PV Module
  • 64 x SolarEdge Power Optimiser
  • 1 x SolarEdge 3 Phase 50kW Inverter 
  • SolarEdge SolarEdge Import / Export Meter
  • Solar PV System Handover and Demonstration to customer
  • RECI and Solar PV Handover Pack
  • ESBN NC5 Management
  • 5 Years Operations and Maintenance backed by SolarEdge
  • After Care Support

 

Check out our Drone Video of this project

    • SolarPV System Size

      50kWp Solar PV DC array

    • € Saved per annum

      20,000 on 40c/kW ESB Rate

    • CO2 Emission Saved / Annum

      20.13 Tonnes

    • Project Completion Time

      3 Days

EastWest-Solar-array-Configuration-on-Amber-Petrol-Station
50kW-Solaredge-Inverter-at-Amber-Petrol-Station-scaled
50kW Smart SolarEdge Inverter wired to Safety fuses
Solaredge Smart Solar - Mitigate Solar Fire Risk
SolarEdge-Optimisation-in-life